Projects

Fanara has been implementing several telecom E-P-C projects in Iran Enterprise market; some of them are summarized as below:

 

Project Subject: Hotline Network

Client: Petropars

Project Description:

In these two projects, FanAra connected 40 different points together in order to establish hotline connection. FanAra had to do fiber optic cable laying, install radio links, integrate with the existing SDH network and was able to perform the project successfully.


Project Subject: Transmission Infra for Earthquake Sensors

Client: Ministry of Energy

Project Description:

In this project FanAra arranged 4 separate teams for installation and commissioning of 12 radio links and was able to accomplish the project successfully within 2 months in rough condition of Abadan.


Project Subject: Contact Center

Client: Rightel

Project Description:

FanAra is the system integrator of Rightel contact center with the aid of its partner company TelC. As it can be seen in the topology a complicated integration is needed in order to run the system and we have truly utilized our expertise in integration in Rightel contact Centre project.


Project Subject: Ethernet Over TDM

Client: Rightel

Project Description:

Since Rightel network is based on pure IP/Ethernet communication and TIC (Telecommunication Infrastructure company of Iran) is still using TDM-Based network, Rightel was obliged to convert the TDM to Ethernet for the interconnection of the sites. FanAra has deployed the project in Boushehr province as it can be seen in the below figures. Fiberhome products are being used in this project.


Project Subject: ATM E-voucher

Client: Taliya

Project Description:


Project Subject: SPD24A, SPD13B and SPD13D Platforms, Telecom Installation

Client: Exctel

Project Description:

  • Joint Closure Movement to Cellar Deck

  • TETRA Antenna Installation

  • Platform Fiber Optic Cable Laying

  • OTN Cabinet Installation and Termination

  • FO Cable Termination

  • TETRA Cabinet Installation and Termination

  • TETRA Base Station/Dispatcher Installation

  • Power & Grounding Cable Laying

  • TETRA Radio Cable Laying to Antenna

  • OTDR Tests


Project Subject: USSD Gateway

Client: MCI

Project Description:

FanAra implemented USSD Gateway solution in fast and secure Mobile Banking systems in MCI. FanAra has demonstrated its OSS and Mobile Banking expertise in a variety of environments through providing advanced signalling, real-time rating and service control solutions to the operators.

The USSD Gateway project which has been deployed for MCI (Mobile Company of Iran) the conversion between N7 and IP signalling and interconnecting different vendor equipments (Cisco, Siemens, Nokia, Ericson and Huawei) for making the USSD service operation is one of the unique practical experience in this field. This company has cooperation with both Tieto (Sweden Company) and Tata Communication (Indian Company) for providing signaling services solutions and services. The certificates and approvals are attached in the appendixes.

The scheme diagram is shown below. First an interaction based on SS7 is made for connecting the mobile network. Using this connection, information can be sent to and received from mobile network STP (Signaling Transfer Point). In this system Sigtran links are used for interconnection, since in new networks and STPs Sigtran links, which are a kind of SS7 transmission in IP networks, are used for easier and cheaper transmission. This makes the system more compatible to the new networks. However, a lot of mobile networks are not use IP based yet.


Project Subject: USSD Gateway

ClientTaliya

Project Description:

FanAra USSD Gateway is already working for limited subscribers in Taliya network.


Project Subject: Phase 13, 22-24 and Monitoring Center Sites, Telecom Installation

Client: Exctel

Project Description:

  • FO Cable Termination

  • TETRA Cabinet Installation and Termination

  • TETRA Base Station/Dispatcher Installation

  • Power & Grounding Cable Laying

  • TETRA Radio Cable Laying to Antenna

  • TETRA Vehicle Radio Installation

  • TETRA Antenna Installation

  • OTDR Tests

  • OTN Cabinet Installation and Termination

 


Project Subject: Azarbayejan 121 distributed Contact center

Client: Ministry of Energy

Project Description:

In this project FanAra implemented a distributed contact Centre for 11 cities utilizing its partner’s software (TelC). The key point of the project was its telecom part and connecting the cities via IP network which was completely done by FanAra.


Project Subject: SPD14A, SPD14C and SPD22 Platforms, Telecom Installation

Client: Exctel

Project Description:

  • Joint Closure Movement to Cellar Deck

  • TETRA Antenna Installation

  • Platform Fiber Optic Cable Laying

  • OTN Cabinet Installation and Termination

  • FO Cable Termination

  • TETRA Cabinet Installation and Termination

  • TETRA Base Station/Dispatcher Installation

  • Power & Grounding Cable Laying

  • TETRA Radio Cable Laying to Antenna

  • OTDR Tests


Project Subject: SPD2, SPD14A, 19A, B ,C Platforms, Telecom Installation

Client: Raya

Project Description:

In this project, FanAra was responsible for relocate, install and laying fiber cable for all of 5 platforms. In some of these platforms, with the suggestion of our technical experts, instead of cutting and moving the T-Support, the existing structures of the platform were used to install the junction boxes.

During this project FanAra assigned to connect and test the laid fiber optic cable between Neighboring platforms.


Project Subject: NG-SDH

Client: Mashhad Municipality

Project Description:

The value of this project was more than 3 million dollars. In addition to the E-P parts of the project, FanAra was responsible for installation and commissioning of all sites (26 sites) and providing necessary technical training to the customer. FanAra has successfully provided two years of technical support and managed services for this project.


Project Subject: IN Migration

Client: Taliya

Project Description:


Project Subject: Jiring - Sigtran

Client: MCI

Project Description:

After implementing the USSD GW and doing some banking transactions MCI decided to establish a Mobile Banking/Mobile Money platform(Jiring). After holding an international tender Telepin (www.telepin.com) was chosen as the contractor. FanAra has been Telepin’s First Line support since 2011 and during the implementation the Sigtran project was done by Fanara. Also JMS (Jiring Monitoring System and JTDG (Jiring Transaction Distribution Gateway) were two projects which were implemented by Fanara.


Project Subject: IVR Announcement

Client: Taliya

Project Description:


Project Subject: WEB E-voucher

Client: Taliya

Project Description:


Project Subject: Phase 6,7,8 CCTV Project

Client: Petropars

Project Description:

In this project FanAra was chosen as the subcontractor of the installation of CCTV project of POGC phase 6,7,8. 22 highly secured cameras. FanAra had to dig the earth for 17 km in the petrochemical area for fiber optic cable laying and also do necessary constructions for mounting and installing camera poles. A comprehensive OTDR tests were also done by our team to ensure the quality of performed cabling and fusions. The project took 6 months due to its tough situation of working in such a sensitive industrial area. All E-P-C parts of the project were done by FanAra.


Project Subject: SPQ1 Platform ,Tetra/GPS antenna, Hotline

Client: Petropars

Project Description:

FanAra has been assigned as a main contractor to install Tetra antenna, tetra cabin and GPS antennas in different levels of SPQ1 platform. GPS antenna has been installed in upper level and Tetra antennas have been Installed and supported by FanAra innovative solution in different three level of platform. In addition, all antennas caballing from antennas to tetra base cabinet and installing their connectors and connecting them   to the Tetra cabinet have been done by FanAra expert team. The complete process of caballing installation process in order to take maximum gain have been done by FanAra team with complete satisfaction of employer representative after doing necessary tests. The project has been completed in two weeks.

In other part of this Project, Fanara team have installed hotline phones in SPQ1 platform in order to connect phase 19 directly to SPQ1 platform. All caballing and connecting the hotline phones to OTN system have been completely done by our team.


Project Subject: Transmission Network 1,2,3

Client: Mellat Bank

Project Description:

FanAra has been the main contractor of Mellat bank for its fiber optic transmission networks. 3 projects have been performed by FanAra which covers more than 20 provinces of Iran. The third network which includes 44 nodes of SDH equipments was distributed in 13 provinces. FanAra organized five separate installation team and managed to successfully finish the project within three months (1 month earlier than the contract deadline)


Project Subject: Transmission Network 1,2,3

Client: Maskan Bank 

Project Description:


Project Subject: SPD2 Platform ,Tetra antenna, Optic fiber fusion

Client: Petropars

Project Description:

Similar to SPQ1 platform project, in SPD2 platform, FanAra Team has been assigned as main contractor to install, support and caballing Tetra antenna (indoor and outdoor antenna) in SPD2 platform as a part of all Platforms and on shore phases RF connection project. During this project the connection (Data/Voice) between SPQ1, SPD2 and phase 19 have been completed and tested.

Based on the strong FanAra resume in fiber optic projects, during this project FanAra assigned to connect and test the laid fiber optic cable between SPQ1 and SPD2 Platform to the OTN system.


Project Subject: Phase 19 Telecom Installation

Client: Petropars

Project Description:

As other part of connection between off shore and on shore connection, FanAra was selected as main contractor by Transtel to install and caballing Tetra antenna in near 80-meter tower to tetra cabins. This project like other project has been done perfectly with full employer satisfaction.


Project Subject: Access Network

Client: Mellat Bank

Project Description:

This project was performed in Qeshm Island and Fanara successfully managed to supply and install DSLAM devices in order to service the stores for using internet and Mellat bank P.O.S services at the same time in two Mega Shop centers with more than 1000 nodes.


Project Subject: Explosion Proof Camera installation ins SPD2 Platform

Client: 3w network

Project Description:

For this project, FanAra signed a full contract with 3W Networks company for supply and installing an explosion proof camera. This project was a vital for Petropars company and because the bad weather problem and rough off shore conditions had many risks. FanAra company based on its full experienced team has performed this project in near 1 month regarding the rough working environment and high degree of safety needed.


Project Subject: Transmission Network

Client: Iran Insurance

Project Description:


 

 