Petro Pars

Project Subject: Hotline Network

Project Description:

In these two projects, FanAra connected 40 different points together in order to establish hotline connection. FanAra had to do fiber optic cable laying, install radio links, integrate with the existing SDH network and was able to perform the project successfully.


Project Subject: Phase 6,7,8 CCTV Project

Project Description:

In this project FanAra was chosen as the subcontractor of the installation of CCTV project of POGC phase 6,7,8. 22 highly secured cameras. FanAra had to dig the earth for 17 km in the petrochemical area for fiber optic cable laying and also do necessary constructions for mounting and installing camera poles. A comprehensive OTDR tests were also done by our team to ensure the quality of performed cabling and fusions. The project took 6 months due to its tough situation of working in such a sensitive industrial area. All E-P-C parts of the project were done by FanAra.


Project Subject: SPQ1 Platform ,Tetra/GPS antenna, Hotline

Project Description:

FanAra has been assigned as a main contractor to install Tetra antenna, tetra cabin and GPS antennas in different levels of SPQ1 platform. GPS antenna has been installed in upper level and Tetra antennas have been Installed and supported by FanAra innovative solution in different three level of platform. In addition, all antennas caballing from antennas to tetra base cabinet and installing their connectors and connecting them   to the Tetra cabinet have been done by FanAra expert team. The complete process of caballing installation process in order to take maximum gain have been done by FanAra team with complete satisfaction of employer representative after doing necessary tests. The project has been completed in two weeks.

In other part of this Project, Fanara team have installed hotline phones in SPQ1 platform in order to connect phase 19 directly to SPQ1 platform. All caballing and connecting the hotline phones to OTN system have been completely done by our team.


Project Subject: SPD2 Platform ,Tetra antenna, Optic fiber fusion

Project Description:

Similar to SPQ1 platform project, in SPD2 platform, FanAra Team has been assigned as main contractor to install, support and caballing Tetra antenna (indoor and outdoor antenna) in SPD2 platform as a part of all Platforms and on shore phases RF connection project. During this project the connection (Data/Voice) between SPQ1, SPD2 and phase 19 have been completed and tested.

Based on the strong FanAra resume in fiber optic projects, during this project FanAra assigned to connect and test the laid fiber optic cable between SPQ1 and SPD2 Platform to the OTN system.


Project Subject: Phase 19 Telecom Installation

Project Description:

As other part of connection between off shore and on shore connection, FanAra was selected as main contractor by Transtel to install and caballing Tetra antenna in near 80-meter tower to tetra cabins. This project like other project has been done perfectly with full employer satisfaction.